
MAWA-050A
Contents
i
Thank you for purchasing our PULSETIG
®
Welding Power Supply
MAWA-050A
.
This operation manual describes its method of operation and precautions for use.
Read this operation manual carefully prior to use. Store appropriately for ready reference.
Contents
Notification of Risk Information
(1) Responsibility for Overall Management ························································· 2
(1) -1. Observance of laws, regulations and safety standard related to
the pulse TIG welding machine ···················································· 2
(1) -2. Execution of safety and health education ······································· 2
(1) -3. Clothes for operations ································································ 2
(2) Prohibition of Disassembly, Repair and Modification of the Welding Power Supply ·· 2
(3) Map of Residual Risks ··············································································· 3
(3) -1. Map of residual risks of the welding power supply unit ······················ 3
(3) -2. Map of residual risks of the standard system ··································· 4
(4) Table of Residual Risks ············································································· 5
(4) -1. Installation ··············································································· 5
(4) -2. Machine operation ····································································· 7
(4) -3. Maintenance ············································································ 11
(4) -4. Scrapping ··············································································· 13
(5) On Disposal ··························································································· 14
(6) Warning Labels ······················································································· 14
1. Overview
(1) Features······························································································· 1-1
(2) Names of Parts ······················································································ 1-2
(2) -1. Front panel ············································································· 1-2
(2) -2. Rear panel ············································································· 1-3
(3) Specifications ························································································ 1-4
(3) -1. Product specifications ······························································ 1-4
(3) -2. Product dimensions ································································· 1-8
(3) -2-1. Main unit ········································································· 1-8
(3) -2-2. Step-down transformer (option) ············································ 1-9
(3) -3. Duty cycle graph ···································································· 1-10
(4) Operational Principle Diagram ··································································· 1-11
(5) Main Parts List ······················································································· 1-11
(6) Accessories ·························································································· 1-11
(7) Options ································································································1-12
(8) CE Marking ···························································································1-14
2. Installation and Connections
(1) Installing Conditions ················································································ 2-1
(2) Connections ·························································································· 2-3
(2) -1. Preparation for connections ······················································· 2-3
(2) -2. Connecting the power supply ····················································· 2-5
(2) -3. Connecting the ground ····························································· 2-7
(2) -4. Connecting the torch ································································ 2-9