![Agilent Technologies Agilent 4396B Service Manual Download Page 221](http://html.mh-extra.com/html/agilent-technologies/agilent-4396b/agilent-4396b_service-manual_2867991221.webp)
11
Theory
of
Operation
The
theory
of
operation
begins
with
a
general
description
of
the
operation
of
a
network
and
spectrum
analyzer
system
(including
the
test
sets).
This
description
is
followed
by
the
detailed
operating
theory
for
the
functional
groups
of
the
analyzer
.
Each
functional
group
consists
of
several
assemblies
that
combine
to
perform
basic
instrument
functions
.
These
groups
are
the
power
supplies
,
the
digital
control,
the
source
,
and
the
receiver
.
The
operation
of
each
group
is
described
to
the
assembly
level
only
.
Detailed
component-level
circuit
theory
is
not
provided
in
this
manual.
Simplied
block
diagrams
illustrate
the
operation
of
each
functional
group
.
The
detailed
analog
section
block
diagram
is
provided
at
the
end
of
this
chapter
.
ANAL
YZER
OPERA
TION
The
4396B
has
two
modes
of
operation:
a
network
analyzer
mode
and
a
spectrum
analyzer
mode
.
T
o
perform
these
operations
,
the
analyzer
uses
four
functional
groups:
a
source
,
a
receiver
,
a
digital
control,
and
a
power
supply
.
See
Figure
11-1.
Figure
11-1.
Simplied
Analyzer
Block
Diagram
The
source
includes
a
synthesizer
.
The
synthesizer
generates
reference
signals
and
two
local
oscillator
signals
.
These
signals
are
used
in
the
source
and
the
receiver
.
Theory
of
Operation
11-1
Summary of Contents for Agilent 4396B
Page 10: ......
Page 32: ......
Page 43: ...Figure 2 7 CAL OUT Level Adjustment Location Adjustments and Correction Constants 2 11 ...
Page 46: ...Figure 2 10 Comb Generator Output 2 14 Adjustments and Correction Constants ...
Page 62: ...Figure 2 26 Final Gain Adjustment Location 2 30 Adjustments and Correction Constants ...
Page 76: ...Figure 3 1 Troubleshooting Organization 3 2 T roubleshooting ...
Page 84: ......
Page 90: ...Figure 5 1 Power Supply Lines Simpli ed Block Diagram 5 2 Power Supply T roubleshooting ...
Page 107: ...Figure 5 12 Power Supply Block Diagram 1 Power Supply T roubleshooting 5 19 ...
Page 108: ...Figure 5 13 Power Supply Block Diagram 2 5 20 Power Supply T roubleshooting ...
Page 109: ...Figure 5 14 Power Supply Block Diagram 3 Power Supply T roubleshooting 5 21 ...
Page 110: ......
Page 112: ...Figure 6 1 Digital Control Group Simpli ed Block Diagram 6 2 Digital Control T roubleshooting ...
Page 124: ......
Page 126: ...Figure 7 1 Source Group Block Diagram 7 2 Source Group T roubleshooting ...
Page 160: ...Figure 8 1 Receiver Group Simpli ed Block Diagram 8 2 Receiver Group T roubleshooting ...
Page 168: ......
Page 184: ...Figure 10 6 External Test Setup 1 Figure 10 7 External Test Setup 2 10 10 Service Key Menus ...
Page 185: ...Figure 10 8 External Test Setup 3 Figure 10 9 External Test Setup 4 Service Key Menus 10 11 ...
Page 226: ...Figure 11 3 Power Supply Functional Group Simpli ed Block Diagram 11 6 Theory of Operation ...
Page 231: ...Figure 11 5 Digital Control Group Simpli ed Block Diagram Theory of Operation 11 11 ...
Page 235: ...Figure 11 6 Source Simpli ed Block Diagram Theory of Operation 11 15 ...
Page 244: ...Figure 11 7 Receiver Simpli ed Block Diagram 11 24 Theory of Operation ...
Page 249: ...Figure IDC5S11001 here Figure 11 8 4396B Source Group Block Diagram Theory of Operation 11 29 ...
Page 254: ...Figure 12 1 Top View Major Assemblies 12 4 Replaceable Parts ...
Page 290: ...Figure 12 36 Main Frame Assembly Parts 17 19 12 40 Replaceable Parts ...
Page 294: ......
Page 308: ......
Page 311: ...Figure C 1 Power Cable Supplied Power Requirement C 3 ...
Page 312: ......
Page 324: ......