![Agilent Technologies Agilent 4396B Service Manual Download Page 187](http://html.mh-extra.com/html/agilent-technologies/agilent-4396b/agilent-4396b_service-manual_2867991187.webp)
21:
INPUT
A
TTENU
A
TOR
Checks
that
the
A8
attenuation
accuracy
relative
to
the
10
dB
setting
and
the
frequency
response
of
the
attenuation
are
within
limits
.
As
a
result,
the
A8
input
attenuator
is
veried.
External
test
setup
1
(shown
in
Figure
10-6)
is
used
in
this
test.
The
test
sets
the
RF
OUT
level
to
a
constant
level
and
varies
the
input
attenuator
setting
at
the
S
input
over
its
entire
range
of
settings
.
F
or
each
setting,
the
RF
OUT
signal
level
is
measured
using
the
S
input
over
the
appropriate
frequency
range
.
22:
RF
TO
S
L
VL
&
FL
TNESS
Checks
that
the
level
accuracy
and
atness
of
the
RF
OUT
signal
are
within
limits
.
As
a
result,
the
A3A1
ALC,
A3A2
2nd
LO
,
A3A3
source
,
A4A2
receiver
RF
,
and
A6
receiver
IF
are
veried.
External
test
setup
1
(shown
in
Figure
10-6)
is
used
in
this
test.
The
test
sets
the
RF
OUT
level
to
a
constant
level
and
measures
the
RF
OUT
level
using
the
S
input
over
the
appropriate
frequency
range
.
23:
S
TO
A
CROSST
ALK
Checks
that
the
input
crosstalk
from
the
S
input
to
the
A
input
and
source
crosstalk
into
the
A
input
are
within
limits
.
As
a
result,
the
NA/SA
switch
circuit
in
A4A2
receiver
RF
is
veried.
External
test
setup
1
(shown
in
Figure
10-6)
is
used
in
this
test.
The
test
sets
the
RF
OUT
level
to
a
constant
level
and
measures
the
level
using
the
S
input
over
the
appropriate
frequency
range
.
24:
S
INPUT
COMPRESSION
Checks
that
the
input
compression
at
the
S
input
is
within
limits
.
As
a
result,
the
A4A2
receiver
RF
and
A6
receiver
IF
are
veried.
External
test
setup
1
(shown
in
Figure
10-6)
is
used
in
this
test.
The
test
sets
the
RF
OUT
level
to
several
levels
and
measures
the
levels
using
the
S
input
over
the
appropriate
frequency
range
.
25:
S
INPUT
RESIDU
ALS
Checks
that
the
residual
response
at
the
S
input
is
lower
than
the
limit.
As
a
result,
the
A4A1
1st
LO
,
A4A2
receiver
RF
,
A5
synthesizer
,
and
A6
receiver
IF
are
veried.
External
test
setup
1
(shown
in
Figure
10-6)
is
used
in
this
test.
The
test
sets
the
RF
OUT
level
to
a
low
level
and
measures
the
levels
of
the
S
input
residuals
at
the
frequency
points
where
the
residuals
are
most
likely
to
appear
.
26:
S
INPUT
NOISE
LEVEL
Checks
that
the
noise
level
at
the
S
input
is
lower
than
the
limit.
As
a
result,
the
A4A2
receiver
RF
and
A6
receiver
IF
are
veried.
External
test
setup
1
(shown
in
Figure
10-6
is
used
in
this
test.
The
test
sets
the
RF
OUT
level
to
a
low
level
and
measures
the
noise
levels
of
the
S
input
at
the
appropriate
frequency
range
.
27:
FRA
CTION
SPURIOUS
The
fraction
spurious
is
caused
by
the
fractional
N
oscillator
in
the
A5
synthesizer
.
This
test
checks
that
the
spurious
level
is
lower
than
the
limit.
As
a
result,
the
A5
synthesizer
is
veried.
Service
K
ey
Menus
10-13
Summary of Contents for Agilent 4396B
Page 10: ......
Page 32: ......
Page 43: ...Figure 2 7 CAL OUT Level Adjustment Location Adjustments and Correction Constants 2 11 ...
Page 46: ...Figure 2 10 Comb Generator Output 2 14 Adjustments and Correction Constants ...
Page 62: ...Figure 2 26 Final Gain Adjustment Location 2 30 Adjustments and Correction Constants ...
Page 76: ...Figure 3 1 Troubleshooting Organization 3 2 T roubleshooting ...
Page 84: ......
Page 90: ...Figure 5 1 Power Supply Lines Simpli ed Block Diagram 5 2 Power Supply T roubleshooting ...
Page 107: ...Figure 5 12 Power Supply Block Diagram 1 Power Supply T roubleshooting 5 19 ...
Page 108: ...Figure 5 13 Power Supply Block Diagram 2 5 20 Power Supply T roubleshooting ...
Page 109: ...Figure 5 14 Power Supply Block Diagram 3 Power Supply T roubleshooting 5 21 ...
Page 110: ......
Page 112: ...Figure 6 1 Digital Control Group Simpli ed Block Diagram 6 2 Digital Control T roubleshooting ...
Page 124: ......
Page 126: ...Figure 7 1 Source Group Block Diagram 7 2 Source Group T roubleshooting ...
Page 160: ...Figure 8 1 Receiver Group Simpli ed Block Diagram 8 2 Receiver Group T roubleshooting ...
Page 168: ......
Page 184: ...Figure 10 6 External Test Setup 1 Figure 10 7 External Test Setup 2 10 10 Service Key Menus ...
Page 185: ...Figure 10 8 External Test Setup 3 Figure 10 9 External Test Setup 4 Service Key Menus 10 11 ...
Page 226: ...Figure 11 3 Power Supply Functional Group Simpli ed Block Diagram 11 6 Theory of Operation ...
Page 231: ...Figure 11 5 Digital Control Group Simpli ed Block Diagram Theory of Operation 11 11 ...
Page 235: ...Figure 11 6 Source Simpli ed Block Diagram Theory of Operation 11 15 ...
Page 244: ...Figure 11 7 Receiver Simpli ed Block Diagram 11 24 Theory of Operation ...
Page 249: ...Figure IDC5S11001 here Figure 11 8 4396B Source Group Block Diagram Theory of Operation 11 29 ...
Page 254: ...Figure 12 1 Top View Major Assemblies 12 4 Replaceable Parts ...
Page 290: ...Figure 12 36 Main Frame Assembly Parts 17 19 12 40 Replaceable Parts ...
Page 294: ......
Page 308: ......
Page 311: ...Figure C 1 Power Cable Supplied Power Requirement C 3 ...
Page 312: ......
Page 324: ......