
CA
UTION
Before
switching
on
this
instrumen
t,
make
sure
that
the
line
v
oltage
selector
switch
is
set
to
the
v
oltage
of
the
p o
w
er
supply
and
the
correct
fuse
is
installed.
Alwa
ys
use
the
three-prong
ac
p o
w
er
cord
supplied
with
this
instrumen
t.
F
ailure
to
ensure
adequate
earth
grounding
b
y
not
using
this
cord
may
cause
instrumen
t
damage.
Before
switching
on
this
pro duct,
make
sure
that
the
line
v
oltage
selector
switch
is
set
to
the
v
oltage
of
the
p o
w
er
supply
and
the
correct
fuse
is
installed.
Assure
the
supply
v
oltage
is
in
the
sp ecied
range.
V
en
tilation
Requiremen
ts:
When
installing
the
instrumen
t
in
a
cabinet,
the
con
v
ection
in
to
and
out
of
the
instrumen
t
m
ust
not
b e
restricted.
The
ambien
t
temp erature
(outside
the
cabinet)
m
ust
b e
less
than
the
maximum
op erating
temp erature
of
the
instrumen
t
b
y
4
C
for
ev
ery
100
w
atts
dissipated
in
the
cabinet.
If
the
total
p o
w
er
dissipated
in
the
cabinet
is
greater
than
800
w
atts,
then
forced
con
v
ection
m
ust
b e
used.
This
pro duct
is
designed
for
use
in
Installation
Category
I I
and
P
ollution
Degree
2
p er
IEC
1010
and
664,
resp ectiv
ely
.
Note
The
detac
hable
p o
w
er
cord
is
the
instrumen
t
disconnecting
device.
It
disconnects
the
mains
circuits
from
the
mains
supply
b efore
other
parts
of
the
instrumen
t.
The
fron
t
panel
switch
is
only
a
standb
y
switch
and
is
not
a
LINE
switch.
vi
Summary of Contents for 8360B
Page 10: ...Declaration of Conformity x ...
Page 53: ...Figure 1 12 Typical Diode Detector Response at 25 C Getting Started Advanced 1 25 ...
Page 136: ...Figure 1 34 Typical Status Register Bit Changes 1 108 Getting Started Programming ...
Page 141: ...Figure 1 38 Inside an Event Detection State Getting Started Programming 1 113 ...
Page 154: ...4ALC5 Figure A 1 ALC System Simplified Block Diagram Operating and Programming Reference A 5 ...
Page 363: ...SCPI STATUS REGISTER STRUCTURE S 56 Operating and Programming Reference ...
Page 364: ...SCPI STATUS REGISTER STRUCTURE Operating and Programming Reference S 57 ...
Page 406: ...2b Menu Maps Menu Maps 2b 1 ...
Page 407: ......
Page 408: ......
Page 409: ......
Page 410: ......
Page 411: ......
Page 412: ......
Page 413: ......
Page 414: ......
Page 415: ......
Page 438: ...Figure 3 1 AC Power Cables Available Installation 3 5 ...