
Lev
eling
with
P
o
w
er
Meters
Lev
eling
with
a
p o
w
er
meter
is
similar
to
lev
eling
with
a
dio
de
detector.
Figure
1-13
sho
ws
the
setup
for
p o
w
er
meter
lev
eling.
Figure
1-13.
Lev
eling
with
a
P
o
w
er
Meter
1.
Set
up
the
equipmen
t
as
sho
wn.
Be
sure
to
set
the
p o
w
er
meter
to
man
ual
range
mo
de
and
note
the
range.
2.
Refer
to
men
u
map
1.
3.
Press
4
ALC
5.
4.
Select
NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN
Leveling
Point
PwrMtr
.
5.
Select
NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN
Pwr
Mtr
Range
.
En
ter
the
range
v
alue
set
for
the
p o
w
er
meter
as
noted
in
step
1.
6.
Select
NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN
Coupling
Factor
,
press
4
0
5
4
dB(m)
5.
Unlike
detector
lev
eling,
p o
w
er
meter
lev
eling
pro
vides
calibrated
p o
w
er
out
of
the
lev
eled
RF
p ort.
Hint
T
o
obtain
atness
corrected
p o
w
er,
refer
to
\Creating
and
Applying
the
User
Flatness
Correction
Array"
in
the
\Optimizing
Sw
ept
Signal
Generator
P
erformance"
section.
Getting
Started
Adv
anced
1-27
Summary of Contents for 8360B
Page 10: ...Declaration of Conformity x ...
Page 53: ...Figure 1 12 Typical Diode Detector Response at 25 C Getting Started Advanced 1 25 ...
Page 136: ...Figure 1 34 Typical Status Register Bit Changes 1 108 Getting Started Programming ...
Page 141: ...Figure 1 38 Inside an Event Detection State Getting Started Programming 1 113 ...
Page 154: ...4ALC5 Figure A 1 ALC System Simplified Block Diagram Operating and Programming Reference A 5 ...
Page 363: ...SCPI STATUS REGISTER STRUCTURE S 56 Operating and Programming Reference ...
Page 364: ...SCPI STATUS REGISTER STRUCTURE Operating and Programming Reference S 57 ...
Page 406: ...2b Menu Maps Menu Maps 2b 1 ...
Page 407: ......
Page 408: ......
Page 409: ......
Page 410: ......
Page 411: ......
Page 412: ......
Page 413: ......
Page 414: ......
Page 415: ......
Page 438: ...Figure 3 1 AC Power Cables Available Installation 3 5 ...