
Figure
1-15.
MM-w
a
v
e
Source
Module
Lev
eling
Using
a
Micro
w
a
v
e
Amplifier
1.
Set
up
the
equipmen
t
as
sho
wn.
2.
Refer
to
men
u
map
1.
3.
Select
NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN
Leveling
Point
Module
.
4.
Select
NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN
Module
Menu
.
5.
Select
NNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN
Module
Select
Auto
or
NNNNNNNNNNNNNNNNN
Front
or
NNNNNNNNNNNNNN
Rear
,
dep ending
on
where
the
in
terface
connection
is
made.
All
of
the
ALC
data
necessary
to
comm
unicate
prop erly
with
the
sw
ept
signal
generator
is
exc
hanged
via
the
SOUR
CE
MODULE
INTERF
A
CE.
Hint
T
o
obtain
atness
corrected
p o
w
er,
refer
to
\Creating
and
Applying
the
User
Flatness
Correction
Array"
in
the
\Optimizing
Sw
ept
Signal
Generator
P
erformance"
section.
Getting
Started
Adv
anced
1-29
Summary of Contents for 8360B
Page 10: ...Declaration of Conformity x ...
Page 53: ...Figure 1 12 Typical Diode Detector Response at 25 C Getting Started Advanced 1 25 ...
Page 136: ...Figure 1 34 Typical Status Register Bit Changes 1 108 Getting Started Programming ...
Page 141: ...Figure 1 38 Inside an Event Detection State Getting Started Programming 1 113 ...
Page 154: ...4ALC5 Figure A 1 ALC System Simplified Block Diagram Operating and Programming Reference A 5 ...
Page 363: ...SCPI STATUS REGISTER STRUCTURE S 56 Operating and Programming Reference ...
Page 364: ...SCPI STATUS REGISTER STRUCTURE Operating and Programming Reference S 57 ...
Page 406: ...2b Menu Maps Menu Maps 2b 1 ...
Page 407: ......
Page 408: ......
Page 409: ......
Page 410: ......
Page 411: ......
Page 412: ......
Page 413: ......
Page 414: ......
Page 415: ......
Page 438: ...Figure 3 1 AC Power Cables Available Installation 3 5 ...