Section 10
Device's physical connections
10.1
Protective earth connections
The IED shall be earthed with a 16.0 mm
2
flat copper cable.
The earth lead should be as short as possible, distance to nearest
eartning point shall be less than 1500 mm.
GUID-A0C4D952-239C-46BE-8156-25450B1AB7BE V1 EN
Figure 195:
Protective earth pin is located to the left of connector X101 on the 4U
half 19” case
1MRS757256 F
Section 10
Device's physical connections
PML630/Compact Load-Shedding Solution
355
Technical Manual