Programming 5 - 32
b5-13 PI Feedback Loss Detection Level
Setting Range:
0 to 100%
Factory Default: 0%
b5-14 PI Feedback Loss Detection Time
Setting Range:
0.0 to 25.0 Seconds
Factory Default: 1.0 Seconds
The Drive interprets feedback loss whenever the feedback signal drops below the value of b5-13 and stays below that level for
at least the time set into b5-14. See Figure 5.17 below for timing details.
Fig 5.17 Loss of PI Feedback Feature
b5-15 Sleep Function Start Level
Setting Range:
0.0 to 200.0 Hz
Factory Default: 0.0 Hz
b5-16 Sleep Delay Time
Setting Range:
0.0 to 25.5 Seconds
Factory Default: 0.0 Seconds
The Sleep Function can be programmed to prevent running the Drive when the PI loop output or the speed command is so low
that no usable work is being done and/or equipment damage may result. The Sleep Function can be Enabled by entering a value
in parameter b5-15. If the Drive’s output drops below the level set by the Sleep Function Start Level (b5-15) and remains there
at least as long as the delay time determined by the Sleep Delay Time (b5-16), then the Drive’s internal Run command drops
out and the Drive output ceases. Though the Drive’s output has ceased, all other Drive functions continue. Once the Drive’s
theoretical output returns to a level above the Sleep Function Start Level (b5-15) and remains above that level for at least the
Sleep Delay Time (b5-16), the internal Run command returns and the Drive output begins again. The b5-16 Delay Time
prevents oscillation about the sleep level.
Note:
The sleep function can be used even if the P1 function is disabled
(b5-01 = “0: Disabled”).
Fig 5.18 Sleep Function Response
Measured
Feedback
T
t
Feedback
Loss Output
T
b5-13
T = b5-14
Feedback
Loss Digital Output
ON (CLOSED)
OFF (OPEN)
TIME
Sleep Level
Outpu
t
Speed Command
Upper Limit
d2-01
Output
Speed Command
b5-15
Содержание E7LBA002
Страница 1: ...E7L Drive Bypass Technical Manual Model E7L Document Number TM E7L 01 ...
Страница 8: ...Introduction vi Notes ...
Страница 12: ...Table of Contents x Notes ...
Страница 54: ...Electrical Installation 2 22 Wiring Diagram ...
Страница 55: ...Electrical Installation 2 23 ...
Страница 87: ...Start Up and Operation 4 9 Notes ...
Страница 202: ...Diagnostic Troubleshooting 6 30 Notes ...
Страница 248: ...Capacity Related Parameters B 6 Notes ...
Страница 279: ...Communications D 27 Note ...
Страница 280: ...Communications D 28 ...
Страница 292: ...Spare Parts F 6 ...
Страница 304: ...Index 12 ...
Страница 305: ......