PPC7 Series Variable Frequency Drive Quick Start Guide

Before you start, be sure you have the correct model for your installation:

1/2, 3/4, and 1 HP use Models PPC7-1-7A3-1-A (NEMA 1) or PPC7-1-7A3-3-A (NEMA 3R)

1-1/2 and 2 HP use Models PPC7-1-13A2-1-A (NEMA 1) or PPC7-1-13A2-3-A (NEMA 3R)

This Quick Start Guide neither supplements nor 

replaces the installation guide.

2

RUN THE CABLE

•  Cables to NEMA 3R rated boxes must be in liquid tight conduit and connectors to maintain the 3R rating. 
•  The input from the CB Panel must be 8” from motor wiring and 8” from all other house wiring. Maintain the 8” separation when 

crossing other wiring.

•  Cross all branch circuits at 90°.
•  The motor wires should exit the building as soon as possible.

4

CONNECT THE VFD TO THE MOTOR

•  Connect the motor leads in the order as shown.
•  Connect the motor ground to the inverter’s grounding terminal as shown.
•  Ground the motor to the well head.
•  Ground the VFD to the motor with a dedicated grounding wire; bundle 

the ground and motor wires.

5

CONNECT THE TRANSDUCER CABLE

•  Connect the Transducer Cable as shown.
•  Do not disturb the factory installed jumpers.
•  Clean out the box: NO DEBRIS!

NOTE:

 Before connecting the pump to the system, ‘pump out’ the well to clean 

it. Be sure that the transducer is connected to the VFD and sees 0 PSI pressure. 

Throttle the pump discharge to reduce the load on the motor. Once the well is clean, 

proceed with plumbing the well.   

 

Risk of electrical shock if VFD is connected to the 

power wiring before hanging the box

. Always hang the VFD box before 

connecting the wires to it.

 

Risk of electrical shock if the VFD is handled or 

service with wet or damp hands. 

Always make sure your hands are dry before 

working on the VFD. Perform all dial setting and keying operations with dry hands.

 

Risk of electrical shock.

 Do not change the cooling fan while power is 

on to the VFD.

 

Fire hazard if installed with incorrect or inadequate 

circuit breaker protection.

 To make sure of protection in the event of an internal 

fault in the VFD, install the VFD on an independent branch circuit protected by a 15 amp circuit 

breaker (Model PPC7-1-7A3, 1/2 to 1 HP) or a 30 amp circuit breaker (Model PPC7-1-13A2, 1-1/2 and 

2 HP), with no other appliances on the circuit.

 

Risk of component explosion and fire if the cables 

are connected incorrectly or the wrong voltage is applied.

 Apply 

only the voltage specified to each terminal. Connect cables to the correct terminals as specified in 

this guide.

California Proposition 65 Warning

 This product and related accessories contain chemicals known to the State of 

California to cause cancer, birth defects or other reproductive harm.

7

NOTE: 

Parameter 9 is used as an example. Set other parameters in the 

same manner.

 

To reset Water Pressure Set Point (Parameter 133), see the 

Installation Guide.

Step 7.1.A: 

Push ‘MODE’ to display parameters.

Step 7.1.B:

 Turn the knob until the display shows P. 9 (Parameter 9).

Step 7.2.A:

 Push ‘SET’ to display the default set point of the selected 

parameter.

Step 7.2.B:

 Turn the knob to adjust the set point (see table at left). 

Release the knob and push ‘SET’. The display will alternate between the 

Parameter Number and the new set point.

Step 7.2.C:

 Repeat for P. 22 (2 HP only)

Step 7.3.A:

 Push ‘MODE’ twice to return to the standard display (Hz).

Step 7.3.B:

 Push ‘SET’ to display Amps.

Step 7.3.C:

 Push ‘SET’ again to display Pressure (PSI). 

Continuing to push ‘SET’ will scroll through these three displays (Hz, Amps, PSI). 

NOTE:

 To lock or unlock settings, to display all parameters, and for 

detailed information, see the Installation Guide.

  H.P. 

Parameter No.  

Set To

  1/2, 1-1/2 

None 

None

 

3/4, 1 

7.3

 

12.2

 

 

22 

62.0

POWER ON!

 

Pump may start; parameters may be set with the pump running.

 

NOTE: 

Check all wiring connections before turning on the power to the VFD.

SET PARAMETERS AT STARTUP

Step 7.3

Step 7.2

Step 7.1

MOUNTING LOCATION

•  On the wall: 

n

 

NEMA 1 rated boxes – interior only

n

 

NEMA 3R rated boxes – protected outdoor installation.

•  Mount the VFD vertically and as close as possible to the 

main CB panel. 

•  Leave 3” Clearance around the VFD for cooling.

1

3

CONNECT THE CB PANEL TO THE VFD

•  Do not wire to a sub-panel – only to the main breaker panel

.

•  Ground the VFD back to the building’s own ground (that is, to the 

system ground from the CB panel, going to the system ground rod).

•  Use a dedicated 230V branch circuit directly from the main CB panel:

  15 amp CB for Model PPC7-1-7A3.

  30 amp CB for Model PPC7-1-13A2.

© 2013 Pentair Ltd. All Rights Reserved. 

PN849 (REV 02/25/13)

293 WRIGHT STREET, DELAVAN, WI 53115  WWW.PumPS.COm
PH: 1-866-9 PENTEK

6

PLUMBING/TANK/CABLES

•  The tank pre-charge should be 70% of the preset pressure point (42 psi for a 60 psi preset).

8

 

REPLACE THE VFD’S COVER

The system is operational.