![background image](http://html.mh-extra.com/html/yaskawa/e7lba002/e7lba002_technical-manual_907669048.webp)
Electrical Installation 2 - 16
Remote Transfer to Bypass
Terminal TB1-4 on the Control PCB A2 is a dedicated terminal for “Remote Transfer” to Bypass operation.
This function allows a contact closure from a BAS, between terminals TB1-4 and TB1-9, to transfer motor operation from
Drive mode to Bypass mode. This remote transfer to Bypass function overrides the Drive Select manual button. An open
contact causes operation in Drive mode and a closed contact results in Bypass mode.
Smoke Purge Operation
Terminal TB1-5 on the Control PCB A2 is a dedicated terminal for “Smoke Purge” operation.
This function allows a contact closure between terminals TB1-5 and TB1-9 to transfer motor operation to Bypass for a
maximum capacity smoke control function. When in smoke purge mode, during emergency fire/smoke situations, the motor
overloads and safety interlock circuit are overridden to shift the priority to protecting people rather than equipment.
[Note: Smoke purge overrides all other control inputs and selector buttons. Smoke purge operation can only be terminated by
opening the contact closure at terminal TB1-5 or by opening the disconnect switch (S1 on schematic E7L-00).]
Multi-Function Digital Inputs
The Bypass 120 VAC logic circuit is interconnected with the Drive multi-function digital input terminals to allow a single
customer interface to control both Drive and Bypass circuits.
As a result, only Drive digital input terminals S6 and S7 are available for other uses. Drive Terminals S6, S7 and SN have been
brought out to TB5-5, TB5-4 and TB5-2 respectively. See Appendix A and Chapter 5, parameter H1-04 and H1-05 for
programming instructions.
Содержание E7LBA002
Страница 1: ...E7L Drive Bypass Technical Manual Model E7L Document Number TM E7L 01 ...
Страница 8: ...Introduction vi Notes ...
Страница 12: ...Table of Contents x Notes ...
Страница 54: ...Electrical Installation 2 22 Wiring Diagram ...
Страница 55: ...Electrical Installation 2 23 ...
Страница 87: ...Start Up and Operation 4 9 Notes ...
Страница 202: ...Diagnostic Troubleshooting 6 30 Notes ...
Страница 248: ...Capacity Related Parameters B 6 Notes ...
Страница 279: ...Communications D 27 Note ...
Страница 280: ...Communications D 28 ...
Страница 292: ...Spare Parts F 6 ...
Страница 304: ...Index 12 ...
Страница 305: ......