Diagnostic & Troubleshooting 6 - 15
OV
DC Bus Overvolt
(Flashing)
DC Bus Overvoltage
208-240VAC: Trip point is
≥
400Vdc
480VAC: Trip point is
≥
800Vdc
High input voltage at R/L1,
S/L2 and T/L3.
Check the input circuit and
reduce the input power to within
specifications.
Extend the time in C1-02.
The deceleration time is set too
short.
Power factor correction
capacitors are being used on the
input to the Drive.
Remove the power factor correc-
tion capacitors.
OVRD
Emergcy
Override
Emergency Override
Emergency Override is active
Forward or Reverse Emergency
Override input is closed
- - -
PRHT
Motor Preheating
Motor Preheating
Motor is preheating
Motor Preheat 2 input is closed
- - -
UV
DC Bus Undervolt
(Flashing)
DC Bus Undervoltage
The DC bus voltage is
≤
L2-05
208-240VAC: Trip point is
≤
190Vdc
480VAC: Trip point is
≤
380Vdc
Low input voltage at R/L1, S/L2
and T/L3.
Check the input circuit and
increase the input power to
within specifications.
The acceleration time is set too
short.
Extend the time in C1-01.
Voltage fluctuation of the input
power is too large.
Check the input voltage.
UV2
CTL PS Undervolt
Control Power Supply Undervoltage of the
control circuit when running
External load connected pulling
down the Drive power supplies.
Cycle power off and on to the
Drive.
Repair or replace the Power PCB/
Gate Drive PCB.
UV3
MC Answerback
Soft Charge Circuit Fault
The pre-charge contactor opened while the
Drive was running.
Contacts on the soft charge
contactor are dirty and the soft
charge contactor does not
function mechanically.
Cycle power off and on to the
Drive.
Check the condition of the soft
charge contactor.
Table 6.4 Alarm Displays and Processing (Continued)
Digital
Operator Display
Description
Cause
Corrective Action
Содержание E7LBA002
Страница 1: ...E7L Drive Bypass Technical Manual Model E7L Document Number TM E7L 01 ...
Страница 8: ...Introduction vi Notes ...
Страница 12: ...Table of Contents x Notes ...
Страница 54: ...Electrical Installation 2 22 Wiring Diagram ...
Страница 55: ...Electrical Installation 2 23 ...
Страница 87: ...Start Up and Operation 4 9 Notes ...
Страница 202: ...Diagnostic Troubleshooting 6 30 Notes ...
Страница 248: ...Capacity Related Parameters B 6 Notes ...
Страница 279: ...Communications D 27 Note ...
Страница 280: ...Communications D 28 ...
Страница 292: ...Spare Parts F 6 ...
Страница 304: ...Index 12 ...
Страница 305: ......