![Waters Xevo TQD Скачать руководство пользователя страница 222](http://html2.mh-extra.com/html/waters/xevo-tqd/xevo-tqd_overview-and-maintenance-manual_3711421222.webp)
B External Connections
222
March 14, 2014, 715004387 Rev. B
8. Route the open end of the exhaust tubing to a suitable exhaust vent.
9. Check the oil level in the pump (see “Checking the roughing pump oil
level” on
, and, if needed, “Adding oil to the roughing pump” on
Requirement:
To ensure correct operation of the roughing pump, do not
operate it when its oil level is less than 30% of the MAX level.
10. Connect electric cables to the roughing pump (see
).
Содержание Xevo TQD
Страница 2: ...ii March 14 2014 715004387 Rev B...
Страница 22: ...xxii March 14 2014 715004387 Rev B...
Страница 56: ...2 Preparing for Operation 56 March 14 2014 715004387 Rev B...
Страница 200: ...4 Maintenance Procedures 200 March 14 2014 715004387 Rev B...
Страница 216: ...A Safety Advisories 216 March 14 2014 715004387 Rev B...
Страница 242: ...B External Connections 242 March 14 2014 715004387 Rev B...
Страница 246: ...C Materials of Construction and Compliant Solvents 246 March 14 2014 715004387 Rev B...