![Waters Xevo TQD Скачать руководство пользователя страница 225](http://html2.mh-extra.com/html/waters/xevo-tqd/xevo-tqd_overview-and-maintenance-manual_3711421225.webp)
Connecting the Edwards oil-free roughing pump
March 14, 2014, 715004387 Rev. B
225
•
NW40 clamps (included in the installation kit)
•
NW25/NW40 adaptor (included in the installation kit)
•
10-mm reducer fitting (included in the installation kit)
•
10-mm ID nylon tube (included in installation kit)
•
12.7-mm clear PVC exhaust tubing (included in the Waters Rotary
Pump Kit)
•
PVC hose clamps (included in the Waters Rotary Pump Kit)
•
1-inch ID vacuum hose (included in the Waters Rotary Pump Kit)
Bear in mind these requirements when connecting the roughing pump:
•
The pump must be horizontal, or within one degree of horizontal.
•
The ambient temperature of area in which you place the pump must
range between 15 and 40 ºC.
•
The pump must be oriented so that it permits easy access to the gas
ballast valve and oil-level sight glass.
For proper ventilation, the following minimum clearances must apply:
TP03165
Left-side minimum clearance
is 15.24 cm (6 inches)
Right-side minimum clearance
is 15.24 cm (6 inches)
Front-side minimum clearance
is 35.56 cm (14 inches)
Back-side minimum clearance
is 15.24 cm (6 inches)
Содержание Xevo TQD
Страница 2: ...ii March 14 2014 715004387 Rev B...
Страница 22: ...xxii March 14 2014 715004387 Rev B...
Страница 56: ...2 Preparing for Operation 56 March 14 2014 715004387 Rev B...
Страница 200: ...4 Maintenance Procedures 200 March 14 2014 715004387 Rev B...
Страница 216: ...A Safety Advisories 216 March 14 2014 715004387 Rev B...
Страница 242: ...B External Connections 242 March 14 2014 715004387 Rev B...
Страница 246: ...C Materials of Construction and Compliant Solvents 246 March 14 2014 715004387 Rev B...