Cleaning the ion block assembly
March 14, 2014, 715004387 Rev. B
129
8. Use the O-ring removal kit to carefully remove the isolation valve O-ring
9. If the isolation valve O-ring shows signs of deterioration or damage,
dispose of it in accordance with local environmental regulations.
10. Use the combined 2.5-mm Allen wrench and cone extraction tool to
loosen the captive PEEK terminal block securing screw.
11. Use the needle-nose pliers to grasp the PEEK terminal block and
partially lift it out of the ion block.
Warning:
To avoid spreading contamination, dispose of the
isolation valve O-ring in accordance with local
environmental regulations.
Notice:
To avoid damaging the heater cartridge assembly wires,
do not bend or twist them when removing the assembly from the
ion block.
PEEK terminal
block securing
screw
Содержание Xevo TQD
Страница 2: ...ii March 14 2014 715004387 Rev B...
Страница 22: ...xxii March 14 2014 715004387 Rev B...
Страница 56: ...2 Preparing for Operation 56 March 14 2014 715004387 Rev B...
Страница 200: ...4 Maintenance Procedures 200 March 14 2014 715004387 Rev B...
Страница 216: ...A Safety Advisories 216 March 14 2014 715004387 Rev B...
Страница 242: ...B External Connections 242 March 14 2014 715004387 Rev B...
Страница 246: ...C Materials of Construction and Compliant Solvents 246 March 14 2014 715004387 Rev B...