B External Connections
220
March 14, 2014, 715004387 Rev. B
Bear in mind these requirements when connecting the roughing pump:
•
The pump must be horizontal, or within one degree of horizontal.
•
The ambient temperature of the area in which you place the pump must
range between 15 and 40 ºC.
•
The pump must be oriented so that it permits easy access to the gas
ballast valve and oil-level sight glass.
For proper ventilation, the following minimum clearances must apply:
To connect the roughing pump:
1. Place the PTFE drip tray on the floor, within 5 feet of the instrument.
2. Place the pump on the PTFE drip tray.
Warning:
To avoid personal contamination with biohazards
or toxic materials, and to avoid spreading contamination to
uncontaminated surfaces, wear clean, chemical-resistant,
powder-free gloves when working with the pump and its
connections.
Warning:
To avoid skeletal or muscle injury, at least two people
must lift the roughing pump.
TP02689
Left-side minimum clearance
is 15.24 cm (6 inches)
Right-side minimum clearance
is 15.24 cm (6 inches)
Back-side minimum clearance
is 15.24 cm (6 inches)
Front-side minimum clearance
is 35.56 cm (14 inches)
Содержание Xevo TQD
Страница 2: ...ii March 14 2014 715004387 Rev B...
Страница 22: ...xxii March 14 2014 715004387 Rev B...
Страница 56: ...2 Preparing for Operation 56 March 14 2014 715004387 Rev B...
Страница 200: ...4 Maintenance Procedures 200 March 14 2014 715004387 Rev B...
Страница 216: ...A Safety Advisories 216 March 14 2014 715004387 Rev B...
Страница 242: ...B External Connections 242 March 14 2014 715004387 Rev B...
Страница 246: ...C Materials of Construction and Compliant Solvents 246 March 14 2014 715004387 Rev B...