![Waters Xevo TQD Скачать руководство пользователя страница 48](http://html2.mh-extra.com/html/waters/xevo-tqd/xevo-tqd_overview-and-maintenance-manual_3711421048.webp)
2 Preparing for Operation
48
March 14, 2014, 715004387 Rev. B
7. To evacuate (pump down) the mass spectrometer, follow the procedure
below for MassLynx software or UNIFI software.
MassLynx software:
a. Click IntelliStart in the MassLynx main window’s lower left-hand
corner.
Result:
The mass spectrometer’s console appears. The mass
spectrometer is in Standby mode.
b. Click Control > Pump, to start the roughing pump.
Tip:
After a 20-second delay, during which the turbopump is
starting, the roughing pump starts. IntelliStart displays
“Instrument in standby”, and the Operate LED remains off.
c.
Wait a minimum of 2 hours for the instrument to be fully pumped
down (evacuated).
Tip:
In the Instrument Console, the System Ready indicator shows
green when the instrument is fully pumped down (evacuated).
d. Click Resolve
or Operate
.
Result:
When the mass spectrometer is in good operating condition,
IntelliStart software displays “Ready” in the Instrument Console.
Tip:
If clicking Resolve fails to put the instrument into Operate
mode, IntelliStart software displays corrective actions in the
Instrument Console.
Содержание Xevo TQD
Страница 2: ...ii March 14 2014 715004387 Rev B...
Страница 22: ...xxii March 14 2014 715004387 Rev B...
Страница 56: ...2 Preparing for Operation 56 March 14 2014 715004387 Rev B...
Страница 200: ...4 Maintenance Procedures 200 March 14 2014 715004387 Rev B...
Страница 216: ...A Safety Advisories 216 March 14 2014 715004387 Rev B...
Страница 242: ...B External Connections 242 March 14 2014 715004387 Rev B...
Страница 246: ...C Materials of Construction and Compliant Solvents 246 March 14 2014 715004387 Rev B...