4 Maintenance Procedures
198
March 14, 2014, 715004387 Rev. B
5. Fit the mounting shaft insertion tool to the mounting shaft.
6. Slide the lamp mounting flange onto the shaft, taking care to align it
correctly.
7. Reinsert the shaft through the side of the source enclosure, and fit the
lamp mounting flange to the APPI source enclosure side.
Tip:
Tighten the securing screws sequentially and by small increments
until they are all fully tight. Doing so ensures that the lamp mounting
flange is uniformly seated on the APPI source enclosure side plate.
8. Use the combined 2.5-mm Allen wrench and cone extraction tool to
tighten the four mounting-flange securing screws.
9. Remove the mounting shaft insertion tool from the mounting shaft.
10. Fit the PEEK insulator to the end of the mounting shaft.
11. Use the combined 2.5-mm Allen wrench and cone extraction tool to fit
and tighten the two insulator retaining screws.
12. Fit the repeller electrode to the PEEK insulator.
Notice:
To prevent damage to the mounting shaft O-rings, fit the
mounting shaft insertion tool to the mounting shaft before fitting
the shaft to the lamp mounting flange.
Mounting shaft
insertion tool
Содержание Xevo TQD
Страница 2: ...ii March 14 2014 715004387 Rev B...
Страница 22: ...xxii March 14 2014 715004387 Rev B...
Страница 56: ...2 Preparing for Operation 56 March 14 2014 715004387 Rev B...
Страница 200: ...4 Maintenance Procedures 200 March 14 2014 715004387 Rev B...
Страница 216: ...A Safety Advisories 216 March 14 2014 715004387 Rev B...
Страница 242: ...B External Connections 242 March 14 2014 715004387 Rev B...
Страница 246: ...C Materials of Construction and Compliant Solvents 246 March 14 2014 715004387 Rev B...