4 Maintenance Procedures
146
March 14, 2014, 715004387 Rev. B
Tip:
If contamination is present, use 1:1 methanol/water, applied to a
lint-free cloth, to carefully clean the grooves.
2. Fit the O-rings (new ones if you disposed of the old) to the PEEK ion
block support.
Tip:
To fit an O-ring in its groove, start fitting the O-ring at the notch in
the groove, and then progressively work the ring into the groove, in
either direction from the notch.
3. Fit the PEEK ion block support onto the instrument’s housing.
4. Use the 3-mm Allen wrench to fit and tighten the 4 screws securing the
PEEK ion block support.
5. Fit the ion block assembly to the PEEK ion block support (see
6. Fit the source enclosure to the instrument (see
Содержание Xevo TQD
Страница 2: ...ii March 14 2014 715004387 Rev B...
Страница 22: ...xxii March 14 2014 715004387 Rev B...
Страница 56: ...2 Preparing for Operation 56 March 14 2014 715004387 Rev B...
Страница 200: ...4 Maintenance Procedures 200 March 14 2014 715004387 Rev B...
Страница 216: ...A Safety Advisories 216 March 14 2014 715004387 Rev B...
Страница 242: ...B External Connections 242 March 14 2014 715004387 Rev B...
Страница 246: ...C Materials of Construction and Compliant Solvents 246 March 14 2014 715004387 Rev B...