![Waters Xevo TQD Скачать руководство пользователя страница 228](http://html2.mh-extra.com/html/waters/xevo-tqd/xevo-tqd_overview-and-maintenance-manual_3711421228.webp)
B External Connections
228
March 14, 2014, 715004387 Rev. B
Connecting to the nitrogen gas supply
Required materials
•
Chemical-resistant, powder-free gloves
•
Sharp knife
•
Wrench
•
6-mm PTFE tubing (included in the Waters Rough Pump Connect Kit)
•
Nitrogen regulator
To connect the nitrogen gas supply:
1. Use the sharp knife to cut a 3.8-cm to 5.0-cm (1.5-inch to 2-inch) length
of 6-mm PTFE tubing.
Requirement:
Cut the tubing squarely (that is, perpendicularly to its
horizontal axis).
2. Connect one end of the 6-mm tubing to one end of the nitrogen supply
in-line filter.
3. Connect the remaining length of the 6-mm PTFE tubing to the other end
of the filter.
4. Connect the free end of the short piece of 6-mm PTFE tubing to the
nitrogen inlet port on the rear of the instrument.
Содержание Xevo TQD
Страница 2: ...ii March 14 2014 715004387 Rev B...
Страница 22: ...xxii March 14 2014 715004387 Rev B...
Страница 56: ...2 Preparing for Operation 56 March 14 2014 715004387 Rev B...
Страница 200: ...4 Maintenance Procedures 200 March 14 2014 715004387 Rev B...
Страница 216: ...A Safety Advisories 216 March 14 2014 715004387 Rev B...
Страница 242: ...B External Connections 242 March 14 2014 715004387 Rev B...
Страница 246: ...C Materials of Construction and Compliant Solvents 246 March 14 2014 715004387 Rev B...