![Waters Xevo TQD Скачать руководство пользователя страница 223](http://html2.mh-extra.com/html/waters/xevo-tqd/xevo-tqd_overview-and-maintenance-manual_3711421223.webp)
Connecting the oil-filled roughing pump
March 14, 2014, 715004387 Rev. B
223
Connecting electric cables to the oil-filled roughing pump
Roughing pump electrical connections:
To make the electrical connections to the roughing pump:
1. Connect the relay cable from the roughing pump d.c. connector to the
pump connector on the instrument’s rear panel.
2. Connect the roughing pump power cord to the main power source.
Roughing pump main
power connector
To power source
Detector rear panel
Roughing pump d.c. connector
Содержание Xevo TQD
Страница 2: ...ii March 14 2014 715004387 Rev B...
Страница 22: ...xxii March 14 2014 715004387 Rev B...
Страница 56: ...2 Preparing for Operation 56 March 14 2014 715004387 Rev B...
Страница 200: ...4 Maintenance Procedures 200 March 14 2014 715004387 Rev B...
Страница 216: ...A Safety Advisories 216 March 14 2014 715004387 Rev B...
Страница 242: ...B External Connections 242 March 14 2014 715004387 Rev B...
Страница 246: ...C Materials of Construction and Compliant Solvents 246 March 14 2014 715004387 Rev B...