207
brackets of the front axle leaf springs with the help of two bracing cables. Thrust
bars should be fastened under the intermediate axle wheels at the front and under
the rear axle wheels at the rear. The front wheels of the truck should be fixed by
lateral thrust bars on the outer side of the wheels.
Fig. 121. Diagram of Loading and Fastening of Three Trucks on
Two Four
-
Axle Railway Flat Cars:
1-spring support bracket
The number of the wires in the bracing cable, their diameter as well as the
number of the nails required to fasten the thrust bars should be chosen in con-
formity with the "Technical Specifications of Cargoes Loading and Fixing", the RF
Ministry of Communications, taking into account the weight of the truck to be
transported (loaded or unloaded).
Fig. 120. Truck Slinging
Diagram:
1–truck front bumper; 2–bumper
catch; 3–rubber protective hoses; 4–
rope; 5–frame; 6–clamp; 7–rear
beam
Содержание 4320-10
Страница 1: ...URAL 4320 10 URAL 4320 31 TRUCKS AND THEIR MODIFICATIONS ...
Страница 180: ...179 Fig 119 Truck Lubrication Diagram ...