6
•
Operation
Pumps C, Pumps F ( VC-Pxx, VF-Pxx)
Operating Manual
Page 111
Parts and additional items required
•
Shut off valve, kit containing one shut off valve and fitting
connections
•
Tubing cutter
•
Solvent suitable for purging the pump
Preparations
1. Turn off the pump flow and wait until the system pressure is down
to zero.
2. Prepare the pump for purging (see
Follow these steps
Follow the steps for each solvent line in which you want to install a shut
off valve.
Figure 30: Installing a shut off valve in the solvent line
No.
Description
1
Solvent line
2
Fitting
3
Ferrule
4
Shut off valve
1. Unscrew the cap of the solvent reservoir and remove the cap
together with the solvent line from the reservoir.
2. Start a purge cycle as appropriate.
3. Stop purging as soon as the solvent line is empty.
4. Retighten the reservoir cap hand-tight. Verify that the retaining
guide remains in the hole in the reservoir cap. If it does not, press
the retaining guide into the hole to ensure that the tubing is kept in
place in the cap.
Содержание thermoscientific Vanquish Pumps C
Страница 4: ...Contacting Us Page 4 Pumps C Pumps F VC Pxx VF Pxx Operating Manual ...
Страница 30: ...2 Safety Page 30 Pumps C Pumps F VC Pxx VF Pxx Operating Manual ...
Страница 40: ...3 Device Overview Page 40 Pumps C Pumps F VC Pxx VF Pxx Operating Manual ...
Страница 196: ...7 Maintenance and Service Page 196 Pumps C Pumps F VC Pxx VF Pxx Operating Manual ...
Страница 214: ...8 Troubleshooting Page 214 Pumps C Pumps F VC Pxx VF Pxx Operating Manual ...
Страница 284: ...12 Accessories Consumables and Replacement Parts Page 284 Pumps C Pumps F VC Pxx VF Pxx Operating Manual ...
Страница 290: ...13 Appendix Page 290 Pumps C Pumps F VC Pxx VF Pxx Operating Manual ...
Страница 296: ...Thermo Fisher Scientific Inc 168 Third Avenue Waltham Massachusetts 02451 USA www thermofisher com ...