Functions
2.26 Additional Functions
SIPROTEC, 7SD5, Manual
C53000-G1176-C169-5, Release date 02.2011
480
2.26.8
Demand Measurement Setup
Long-term average values are calculated by 7SD5 and can be read out with the point of time (date and time)
of the last update.
2.26.8.1 Long-Term Average Values
The long-term average values of the three phase currents
I
Lx
, the positive sequence component
I
1
of the three
phase currents, and the real power P, reactive power Q, and apparent power S are calculated within a set
period of time and indicated in primary values.
For the long-term average values mentioned above, the length of the time window for averaging and the fre-
quency with which it is updated can be set. The corresponding min/max values can be reset via binary inputs,
via the integrated control panel or using the DIGSI software.
2.26.8.2 Setting Notes
Mean values
The time interval for measured value averaging is set at address
2801
DMD Interval
. The first number spec-
ifies the averaging time window in minutes while the second number gives the frequency of updates within the
time window.
15 Min., 3 Subs
, for example, means that time averaging occurs for all measured values that
arrive within 15 minutes. The output is updated every 15/3 = 5 minutes.
At address
2802
DMD Sync.Time
you can determine whether the averaging time, selected under address
2801
, begins on the hour (
full hour
) or is to be synchronized with another point in time (
a quarter past
,
half hour
or
a quarter to
).
If the settings for averaging are changed, then the measured values stored in the buffer are deleted, and new
results for the average calculation are only available after the set time period has passed.
2.26.8.3 Settings
Addr.
Parameter
Setting Options
Default Setting
Comments
2801
DMD Interval
15 Min., 1 Sub
15 Min., 3 Subs
15 Min.,15 Subs
30 Min., 1 Sub
60 Min., 1 Sub
60 Min., 1 Sub
Demand Calculation Intervals
2802
DMD Sync.Time
On The Hour
15 After Hour
30 After Hour
45 After Hour
On The Hour
Demand Synchronization Time
Содержание SIPROTEC
Страница 20: ...Contents SIPROTEC 7SD5 Manual C53000 G1176 C169 5 Release date 02 2011 20 ...
Страница 351: ...Functions 2 18 Synchronism and Voltage Check optional SIPROTEC 7SD5 Manual C53000 G1176 C169 5 Release date 02 2011 351 ...
Страница 494: ...Functions 2 27 Command Processing SIPROTEC 7SD5 Manual C53000 G1176 C169 5 Release date 02 2011 494 ...
Страница 640: ...Technical Data 4 27 Dimensions SIPROTEC 7SD5 Manual C53000 G1176 C169 5 Release date 02 2011 640 ...
Страница 657: ...Appendix A 2 Terminal Assignments SIPROTEC 7SD5 Manual C53000 G1176 C169 5 Release date 02 2011 657 7SD5 W ...
Страница 754: ...Appendix A 10 Measured Values SIPROTEC 7SD5 Manual C53000 G1176 C169 5 Release date 02 2011 754 ...
Страница 756: ...Literature SIPROTEC 7SD5 Manual C53000 G1176 C169 5 Release date 02 2011 756 ...
Страница 768: ...Glossary SIPROTEC 7SD5 Manual C53000 G1176 C169 5 Release date 02 2011 768 ...