![Siemens SINAMICS G120P Скачать руководство пользователя страница 150](http://html.mh-extra.com/html/siemens/sinamics-g120p/sinamics-g120p_operating-instructions-manual_378189150.webp)
Commissioning
5.5 Procedure for commissioning via STARTER
Inverter cabinet units
150
Operating Instructions, 12/2014, A5E32923362A
⇒
Once you have done this, click OK to confirm the settings and return to the project wizard.
Figure 5-10 Complete setting the interface
⇒
Click on Continue > to set up a drive unit in the project wizard.
A search is made for the connected device online via the selected access point (in this case,
via USB), and is then displayed in the preview window of the project Wizard.
Figure 5-11 Drive unit inserted
⇒
Click on Continue >
A project summary is displayed.
Содержание SINAMICS G120P
Страница 1: ......
Страница 2: ......
Страница 8: ...Preface Inverter cabinet units 8 Operating Instructions 12 2014 A5E32923362A ...
Страница 16: ...Table of contents Inverter cabinet units 16 Operating Instructions 12 2014 A5E32923362A ...
Страница 255: ...Operation 6 8 Communication via RS485 Inverter cabinet units Operating Instructions 12 2014 A5E32923362A 255 ...
Страница 432: ...Application examples Inverter cabinet units 432 Operating Instructions 12 2014 A5E32923362A ...
Страница 496: ......