Commissioning
5.5 Procedure for commissioning via STARTER
Inverter cabinet units
Operating Instructions, 12/2014, A5E32923362A
149
Figure 5-8
Setting the access point
⇒
Select the access point:
●
Select the S7ONLINE access (STEP7), if the connection to the drive unit is established
via PROFINET or PROFIBUS.
●
Select the DEVICE access, if the connection to the drive unit is established via the USB
interface.
⇒
Click on OK, to acknowledge the selection and close the window.
⇒
In the previous window, click on PG/PC ... and set up the interface in accordance with your
device configuration.
The Properties..., Copy..., Delete... and Select... buttons are now active.
Figure 5-9
Setting the interface
Содержание SINAMICS G120P
Страница 1: ......
Страница 2: ......
Страница 8: ...Preface Inverter cabinet units 8 Operating Instructions 12 2014 A5E32923362A ...
Страница 16: ...Table of contents Inverter cabinet units 16 Operating Instructions 12 2014 A5E32923362A ...
Страница 255: ...Operation 6 8 Communication via RS485 Inverter cabinet units Operating Instructions 12 2014 A5E32923362A 255 ...
Страница 432: ...Application examples Inverter cabinet units 432 Operating Instructions 12 2014 A5E32923362A ...
Страница 496: ......