Connecting
5.4 Connecting IO-Link I/O modules to functional ground
IO-Link I/O modules
36
System Manual, 08/2021, A5E48755395-AB
Mounting
To connect IO-Link I/O modules to functional ground, proceed as follows:
1.
Drill two fastening holes.
2.
Strip the grounding cable.
3.
Fasten the cable lug to the grounding cable.
4.
Screw the module and the cable lug with the 4 mm fastening screws using a torque of
1.2 Nm.
The figure below shows how to connect the functional ground.
Figure 5-5
Connecting the functional ground
Note
Grounding in the case of a non-conductive mounting surface
Make sure there is a low-impedance connection between the module and functional ground.
Reference
You will find more information on installing the modules in the section Mounting modules
(Page 19).
Содержание SIMATIC ET 200AL
Страница 2: ......
Страница 143: ......
Страница 218: ......
Страница 250: ......
Страница 296: ......
Страница 337: ......
Страница 365: ......
Страница 392: ......
Страница 419: ......
Страница 451: ......
Страница 483: ......
Страница 597: ......
Страница 648: ......
Страница 702: ......
Страница 739: ......
Страница 781: ......
Страница 804: ......
Страница 828: ......
Страница 853: ......
Страница 880: ......
Страница 906: ......
Страница 996: ...Diagnostics ...
Страница 1121: ......
Страница 1565: ......