![Perimeter Technology VU-ACD /100 Скачать руководство пользователя страница 94](http://html.mh-extra.com/html/perimeter-technology/vu-acd-100/vu-acd-100_maintenance-manual_1529976094.webp)
2-76
Maintenance Utilities
VU-ACD™/100 Maintenance Guide – Host/DOS
2.8.3
Schedule Daily Switch Initialization Request
!
The VU-ACD/100 system must be rebooted to implement a daily Switch
initialization request schedule.
Step
Prompt
Action
1
MAINTENANCE MENU
1) Shut Down ACD MIS
2) Shut Down ACD MIS & UNIX System
3) Tape Backup/Restore Utilities
4) System Logs
5) Load Management Limits
6) Change Maintenance Logon Password
7) System Hardware Configuration
8) Install a Software Update
9) Request Switch Initialization
10) 5ESS Provisioning
11) List Logged-In Users
Select an option, or enter q to quit:
Type
9
and press
Enter
to select Request
Switch Initialization.
2
SWITCH INITIALIZATION REQUEST MENU
1) Execute Switch Initialization Request Now
2) Schedule One Time Switch Initialization Request
3) Schedule Daily Switch Initialization Request
4) Cancel Scheduled Daily Switch Init Request
Select an option or q to quit:
Type
3
and press
Enter
to select Schedule
Daily Switch Initialization Request.
3
Switch Initialization Request
********** CAUTION **********
This operation will temporarily stop communication between
the ACD MIS and all Switch links in order to request new
Switch initialization data. Data collection and Real-Time
updates will be suspended until the communication is
re-established between the ACD MIS and the Switch links
and after the Switch initialization data has been received.
Do you wish to proceed (y/n) ?
Type
y
and press
Enter
.
4
Schedule Switch Initialization Request Daily
Enter the time to execute the Switch Initialization Request
or Q to quit - (range = 00:00 - 23:59) - [hh:mm] : {
Scheduled Time = 05:30 (5:30 A.M.
daily)
Type in the desired time (24-hour format,
hh:mm) when the Switch initialization request
will be sent; press
Enter
.
The initialization request will be sent every
day at the time entered.