![Perimeter Technology VU-ACD /100 Скачать руководство пользователя страница 90](http://html.mh-extra.com/html/perimeter-technology/vu-acd-100/vu-acd-100_maintenance-manual_1529976090.webp)
2-72
Maintenance Utilities
VU-ACD™/100 Maintenance Guide – Host/DOS
2.8
Request Switch Initialization
This option allows the user to simultaneously request initialization data from all Centrex ACD switches,
Net-VU switch engines and InterLink ports immediately, scheduled one time or scheduled daily.
A previously scheduled initialization request can be canceled at any time.
2.8.1
Execute Switch Initialization Request Now
Step
Prompt
Action
1
MAINTENANCE MENU
1) Shut Down ACD MIS
2) Shut Down ACD MIS & UNIX System
3) Tape Backup/Restore Utilities
4) System Logs
5) Load Management Limits
6) Change Maintenance Logon Password
7) System Hardware Configuration
8) Install a Software Update
9) Request Switch Initialization
10) 5ESS Provisioning
11) List Logged-In Users
Select an option, or enter q to quit:
Type
9
and press
Enter
to select Request
Switch Initialization.
2
SWITCH INITIALIZATION REQUEST MENU
1) Execute Switch Initialization Request Now
2) Schedule One Time Switch Initialization Request
3) Schedule Daily Switch Initialization Request
4) Cancel Scheduled Daily Switch Init Request
Select an option or q to quit:
Type
1
and press
Enter
to select Execute
Switch Initialization Request Now.
3
Switch Initialization Request
********** CAUTION **********
This operation will temporarily stop communication between
the ACD MIS and all Switch links in order to request new
Switch initialization data. Data collection and Real-Time
updates will be suspended until the communication is
re-established between the ACD MIS and the Switch links
and after the Switch initialization data has been received.
Do you wish to proceed (y/n) ?
Type
y
and press
Enter
.
4
Execute Switch Initialization Request
Now
Are you sure you wish to request Switch
initialization now (y/n) ?
Type
y
and press
Enter
to send the initializa-
tion request now. Proceed to Step 5.
– or –
Type
n
and press
Enter
to cancel the request
and return to the Switch Initialization Request
Menu.