![Perimeter Technology VU-ACD /100 Скачать руководство пользователя страница 9](http://html.mh-extra.com/html/perimeter-technology/vu-acd-100/vu-acd-100_maintenance-manual_1529976009.webp)
VU-ACD™/100 Maintenance Guide – Host/DOS Preface
P
REFACE
Introduction
This document contains VU-ACD/100 guidelines for performing preventive and corrective maintenance
on a VU-ACD/100 v43 ACD Management Information System (MIS). Maintenance technicians and
administrators should refer to the documentation provided by the respective original equipment manu-
facturers (OEMs) for additional product information.
This guide contains the following sections:
• Section 1 – Introduction provides an overview of maintenance procedures, troubleshooting,
Product Support and Training offerings.
• Section 2 – VU-ACD/100 Maintenance Utilities describes system shutdown, tape backup,
load management limits, password maintenance, and hardware configuration management
procedures.
• Section 3 – Preventive, Corrective & File Maintenance defines and describes three categories
of maintenance procedures.
• Section 4 – Troubleshooting outlines problem identification, fault isolation and problem
resolution for VU-ACD/100 systems.
• Section 5 – Configuration Changes explores the effects of changes to the Centrex ACD
switch and/or VU-ACD/100 system configurations.
• Appendix A – Log File Processes lists ACD MIS processes that appear in log files.
Documentation Set
In addition to this manual and the Release Notes accompanying the software load, users should become
familiar with the other publications in the VU-ACD/100 v43 Documentation Set:
• VU-ACD/100 v43 User's Guide – Host/DOS P/N 40530-xx
• VU-ACD/100 v43 Installation Guide – Host/DOS P/N 40531-xx
• VU-ACD/100 v43 User's Guide – Host/DOS P/N 40530-xx
• VU-ACD/100 v43 Database Table Export Guide – Host/DOS P/N 40533-xx
• VU-ACD/100 v43 Load Management Guide – Host/DOS P/N 40534-xx
• VU-ACD/100 v43 User Group Administration Guide – Host/DOS P/N 40535-xx
• VU-ACD/100 v43 System Planning Guide P/N 40536-xx
• VU-ACD/100 v43 System Administration Guide – Host/DOS P/N 40537-xx
• Lucent Technologies 5ESS Call Center Survey P/N 40521-xx
• VU-ACD/100 For Windows v3 Installation Guide
P/N 40539-xx
• VU-ACD/100 For Windows v3 Real-Time Display Guide
P/N 40540-xx
• VU-ACD/100 For Windows v3 Configuration Guide
P/N 40548-xx
• VU-ACD/100 For Windows v3 Load Management Guide
P/N 40541-xx
• VU-ACD/100 For Windows v3 Standard Reports Guide
P/N 40542-xx
• VU-ACD/100 For Windows v3 Database Table Export Guide
P/N 40543-xx
• VU-ACD/100 For Windows v3 Custom Reports Guide
P/N 40544-xx
• VU-ACD/100 For Windows v3 Recent Change/Verify Guide
P/N 40545-xx
• Net-VU Internet ACD Reference Guide
P/N 40556-xx