![Perimeter Technology VU-ACD /100 Скачать руководство пользователя страница 74](http://html.mh-extra.com/html/perimeter-technology/vu-acd-100/vu-acd-100_maintenance-manual_1529976074.webp)
2-56
Maintenance Utilities
VU-ACD™/100 Maintenance Guide – Host/DOS
Remove A Tape Drive
(continued)
Step
Prompt
Action
15
SYSTEM HARDWARE CONFIGURATION
1) Node Configuration
2) Maintenance Modem Configuration
3) Tape Configuration
4) Multiport Serial I/O Configuration
5) System Printer Configuration
6) Reset All External Displays
Select an option or ‘q’ to quit:
Type
q
and press
Enter
.
16
MAINTENANCE MENU
1) Shut Down ACD MIS
2) Shut Down ACD MIS & UNIX System
3) Tape Backup/Restore Utilities
4) System Logs
5) Load Management Limits
6) Change Maintenance Logon Password
7) System Hardware Configuration
8) Install a Software Update
9) Request Switch Initialization
10) 5ESS Provisioning
11) List Logged-In Users
Select an option, or enter q to quit:
To reboot the system, type
2
and press
Enter
to
select Shut Down ACD MIS & UNIX System.
Refer to Section 2.1.2.2 for details about the
reboot procedure.