-
231
-
'11 • SCM-SM-110
Sub PCB (PWB4) on the 1st layer
2. Disconnect the cables (Red
& White) connected to the
terminal TB3 & TB4 of N/F
PCB (PWB3), after dismount
the 1st layer as follows.
1) Dismount the 1st layer
according to the dismounting
procedure for control PCB
after loosening 2 screws
and disconnect the power
cables on secondary side
of TB1.
2) Loosen 2 screws and
remove the cables (Red &
White) from TB3 & TB4
on the N/F PCB (PCB3)
located on back side of
the 1st layer.
3. Pinch the head of locking
supports (4 pieces) and
remove the Sub PCB (PWB4).
〔
PCB3
〕
Screws
TB3
TB4
TB1
Disconnect power cables
Disconneced cables
Locking supports
Содержание SCM100ZJ-S1
Страница 64: ...63 11 SCM SM 110 Service data record form 55...
Страница 194: ...193 11 SCM SM 110 4 Ceiling cassette 4way compact type FDTC refer to page 157 to 172...
Страница 198: ...197 11 SCM SM 110 PJAO12D786...
Страница 223: ...222 11 SCM SM 110 4 way valve coil 1 Disconnect the connector 2 Loosen a screw and remove the coil Connector Screw Coil...
Страница 237: ...236 11 SCM SM 110 EEVB EEVC EEVA EEVD MARKING GREEN BLUE RED WHITE EEV A EEV D 46 WH 46 46 46 M YE OR BL RD Input 12VDC...