-
69
-
'11 • SCM-SM-110
(9) Checking the indoor electrical equipment
(a) Indoor PCB check procedure
(b) Outdoor unit
Is there voltage between terminal
blocks
①
and
②
? (AC 220/230/240
V)
Indoor electrical components
are normal.
Is the voltage between terminal
blocks
②
and
③
oscillating between
DC 0 and 20V?
Inspect power source
for outdoor unit.
Replace fuse.
Replace indoor PCB.
Is the fuse burnt out? (3.15 A)
YES
YES
YES
NO
NO
NO
(b) Indoor unit fan motor check procedure
1) Indoor PCB output check
① ④
⑤
2) Fan motor resistance check
⑥
⑤
④
③
②
①
⑥
⑤
④
③
②
①
FM
I
DC15V
Indoor PCB
DC 280V
DC several V
(4 – 6 V)
CNU
(–)
GND
Blu
e
Yello
w
White
Black
Red
Sensor
Operation
mode
Phenomenon
Shortcircuit
Disconnected wire
Heat exchanger
sensor
Cooling
Heating
Ourdoor air
temperature sensor
Cooling
Heating
Discharge pipe
sensor
All modes
Measuring point
Resistance when normal
① − ③
−
④ − ③
−
Measuring
point
Resistance when
normal
① − ③
̅
̅
④ − ③
⑤ − ③
⑥ − ③
Defrosting is performed for 10 minutes at approx. 40 minutes.
Defrosting is performed for 10 minutes at approx. 40 minutes.
k
Содержание SCM100ZJ-S1
Страница 64: ...63 11 SCM SM 110 Service data record form 55...
Страница 194: ...193 11 SCM SM 110 4 Ceiling cassette 4way compact type FDTC refer to page 157 to 172...
Страница 198: ...197 11 SCM SM 110 PJAO12D786...
Страница 223: ...222 11 SCM SM 110 4 way valve coil 1 Disconnect the connector 2 Loosen a screw and remove the coil Connector Screw Coil...
Страница 237: ...236 11 SCM SM 110 EEVB EEVC EEVA EEVD MARKING GREEN BLUE RED WHITE EEV A EEV D 46 WH 46 46 46 M YE OR BL RD Input 12VDC...