517
CHAPTER 12 CONTROL SUB FUNCTIONS
12
12.
2
Sub
F
u
nct
ion
s S
pecif
ic
al
ly
f
o
r M
a
chine
O
P
R
(4) Control precautions
(a) The following data are set after the OP shift amount is complete.
• OPR complete flag ("[Md.31] Status: b4)
• [Md.20] Current feed value
• [Md.21] Machine feed value
• [Md.26] Axis operation status
OPR request flag ([Md.31] Status: b3) is reset after completion of the OP shift.
(b) "[Pr.53] OP shift amount" is not added to "[Md.34] Movement amount after near-
point dog ON". The movement amount immediately before the OP shift operation,
considering near-point dog ON as "0", is stored. For the stopper method (1) 2) 3)),
the movement amount is not changed from "0".
(c) When using the OP shift function with the stopper method (1) 2) 3)) selected for the
OPR method, configure the OP shift operation in the opposite direction of the OPR
direction. It cannot shift to the OPR direction due to a mechanical stopper in the
OPR direction.
(5) Setting method
To use the "OP shift function", set the required details in the parameters shown in the following table, and write
them to the LD75.
When the parameters are set, the OP shift function will be added to the machine OPR control. The set data is
made valid on the rising edge (OFF to ON) of the PLC READY signal [Y0].
Refer to
Page 118, Section 5.2 for the information on detail settings.
Remark
●
Parameters are set for each axis.
●
It is recommended that the parameters be set whenever possible with GX Works2. Execution by program uses many
programs and devices. The execution becomes complicated, and the scan times will increase.
Setting item
Setting
value
Setting details
Factory-set initial value
[Pr.53]
OP shift amount
Set the shift amount during the OP shift.
0
[Pr.56]
Speed designation
during OP shift
Select the speed during the OP shift
0: [Pr.46] OPR speed
1: [Pr.47] Creep speed
0
Содержание MELSEC-L LD75D
Страница 1: ...MELSEC L LD75P LD75D Positioning Module User s Manual LD75P1 LD75P2 LD75P4 LD75D1 LD75D2 LD75D4 ...
Страница 2: ......
Страница 11: ...9 Memo ...
Страница 47: ...45 CHAPTER 2 SYSTEM CONFIGURATION 2 2 1 General Image of System 1 When connected to a CPU module ...
Страница 176: ...174 ...
Страница 264: ...262 ...
Страница 266: ...264 ...
Страница 267: ...265 CHAPTER 6 PROGRAM USED FOR POSITIONING CONTROL 6 6 4 Positioning Program Examples ...
Страница 268: ...266 ...
Страница 269: ...267 CHAPTER 6 PROGRAM USED FOR POSITIONING CONTROL 6 6 4 Positioning Program Examples ...
Страница 270: ...268 ...
Страница 271: ...269 CHAPTER 6 PROGRAM USED FOR POSITIONING CONTROL 6 6 4 Positioning Program Examples ...
Страница 272: ...270 Z ABRST1 instruction execution ...
Страница 273: ...271 CHAPTER 6 PROGRAM USED FOR POSITIONING CONTROL 6 6 4 Positioning Program Examples ...
Страница 278: ...276 ...
Страница 279: ...277 CHAPTER 6 PROGRAM USED FOR POSITIONING CONTROL 6 6 4 Positioning Program Examples ...
Страница 280: ...278 ...
Страница 281: ...279 CHAPTER 6 PROGRAM USED FOR POSITIONING CONTROL 6 6 4 Positioning Program Examples ...
Страница 282: ...280 ...
Страница 283: ...281 CHAPTER 6 PROGRAM USED FOR POSITIONING CONTROL 6 6 4 Positioning Program Examples ...
Страница 284: ...282 ...
Страница 285: ...283 CHAPTER 6 PROGRAM USED FOR POSITIONING CONTROL 6 6 4 Positioning Program Examples ...
Страница 286: ...284 ...
Страница 287: ...285 CHAPTER 6 PROGRAM USED FOR POSITIONING CONTROL 6 6 4 Positioning Program Examples ...
Страница 316: ...314 Memo ...
Страница 685: ...683 APPENDICES A Appendix 1 Function Update Appendix 1 1 Function comparison Memo ...
Страница 738: ...736 Memo ...
Страница 806: ...804 5 LD75D2 Unit mm 6 LD75D4 Unit mm 45 4 90 4 95 4 45 45 DIN rail center 45 4 90 4 95 4 45 45 DIN rail center ...
Страница 817: ......