
Advanced Operations: Process-Control
4 - 23
Standard Turntable Power Washer v. 4.0
The MART Corporation
6. Monitoring
You must set up a monitoring schedule for washer assemblies and parts. Start with the
following:
·
Lubrication
·
Sludge build-up
·
Intake filter
·
Amp draw & nozzle wear
Use the
Service Schedule
on the front of the control-panel door as a guide in
establishing a monitoring schedule.
NOTE
: It is important to keep a monitoring record -- post it on the
side of the washer or on the door. Have operators initial the record
each day after monitoring, and indicate if any maintenance
procedures need to be performed.
Refer to chapter
"Maintenance"
for maintenance procedures.
6.1. Monitoring Lubrication
Monitoring lubrication of the following
on a daily basis
is extremely important for reliable
washer performance:
·
Turntable bearings
·
Power blast manifold (PBM) swivel (
joint and upper bearing
)
·
General lubrication (bearings, motors, and pumps)
Assemblies and parts need to be greased or oiled based on the hours of operation.
Refer to the
Service Schedule
on the front of the control-panel door.
NOTE
: It is important to keep a lubrication record -- post it on the
side of the washer or on the door. Have operators initial the record
each day after completing lubrication procedures.
Содержание Cyclone 30 Series
Страница 250: ...Options 7 71 Standard Turntable Power Washer v 4 0 The MART Corporation Fig 7 36 Rack and Fixture Set...
Страница 295: ...MART REVISION 06 06 06 Revision 03 OWNER S MANUAL for MART VERTICAL POWER WASHER PUMP...
Страница 308: ...12 Fig 1 Main Pump Cut Away 1530 Frame Hardened Steel Throttle Bushing...
Страница 310: ...14 Fig 2 Main Pump Cut Away 1530 Frame Composite Throttle Bushing...
Страница 312: ...16 Fig 3 Main Pump Cut Away 12V Frame Composite Throttle Bushing...
Страница 314: ...18 Fig 4 Boost Pump Cut Away 1530 Frame Composite Throttle Bushing...
Страница 316: ...20 Fig 4 Boost Pump Cut Away 12V Frame Composite Throttle Bushing...