mc²56 MKII Technical Manual
V5.10.2/1
54
Chapter 2: Installation
Installing the Compact I/O
Installing the Compact I/O
The
Compact I/O
is designed to be mobile with two lifting handles mounted on the front of the chassis. All plug-in
connectors are located on the front panel, with power connectors at the rear. When installing, please leave
enough room for the cables.
Temperature and Cooling
The unit is convection cooled and therefore is ideal for installation within noise critical environments. Proper
operation can only be guaranteed at an ambient temperature between 10°C and 35°C and a relative humidity
between 15% and 85% (not condensing).
Warning
Take care that no devices or cables obstruct the flow of air thereby hindering cooling.
Power
The
Compact I/O
is delivered with dual redundant power supply units (PSUs); the load is shared between the two
supplies.
Warning
All devices
MUST
be connected to the mains using the three-cord power leads supplied with the system.
When running with two mains supplies (PSU 1 and PSU 2), make sure that both circuits lie on the same
ground potential. Otherwise, an internal bridge of two ground wires will lead to a ground loop!
Содержание mc256 MKII
Страница 1: ...Technical Manual mc 56 MKII Version 5 10 2 1 Edition 12 September 2017...
Страница 146: ...mc 56 MKII Technical Manual V5 10 2 1 146 Chapter 3 AdminHD Core Configuration Defining the System...
Страница 228: ...mc 56 MKII Technical Manual V5 10 2 1 228 Chapter 3 AdminHD The Main Menus Window Shows or hides the sub windows...
Страница 350: ...mc 56 MKII Technical Manual V5 10 2 1 350 Chapter 7 Appendices Local I O Wiring...
Страница 351: ...mc 56 MKII Technical Manual V5 10 2 1 351 Chapter 7 Appendices Local I O Wiring...
Страница 352: ...mc 56 MKII Technical Manual V5 10 2 1 352 Chapter 7 Appendices Local I O Wiring...