Ch.2 Unpacking and Installation
< 62 >
DRYPRO Vstage MODEL 793 Installation Manual Ver.1.00 2004.11
5
Set the upper opposing rack with the film
inseted in the step-2 on the lever opposing rack,
and tilt the upper opposing rack 90˚ with the
fulcrum illustrated in the left.
Tilt the upper
opposing rack 90˚
with the fulcrum here.
6
Remove the film from upper opposing rack.
7
Secure the upper opposing rack with 2 screws
(TP screws M4X8), one at the front, the other at
the back.
8
Replace the upper cover holding the unit from
the front and back as shown at left.
Be careful of the orientation of the upper
cover to the heat-processing drum bearings
when replacing.
Replacement will be impossible unless the
heat-processing drum spindle does not
mesh with the spindle bearings.
Heat-processing drum spindle
Heat-processing drum bearings
Содержание DRYPRO793
Страница 4: ......
Страница 34: ...Ch 1 Pre installation Information 30 DRYPRO Vstage MODEL 793 Installation Manual Ver 1 00 2004 11...
Страница 88: ...Ch 2 Unpacking and Installation 84 DRYPRO Vstage MODEL 793 Installation Manual Ver 1 00 2004 11...
Страница 140: ...Ch 3 Setup 136 DRYPRO Vstage MODEL 793 Installation Manual Ver 1 00 2004 11...
Страница 198: ...Ch 6 Web Maintenance Mode 194 DRYPRO Vstage MODEL 793 Installation Manual Ver 1 00 2004 11...