Ch.2 Unpacking and Installation
< 52 >
DRYPRO Vstage MODEL 793 Installation Manual Ver.1.00 2004.11
32
Slide supply tray 3 into position into the main
body.
If the supply tray configuration has been changed, the tray count setting under
"FILM SETUP"(TRAY SETUP) must be adjusted accordingly.
p.88 FILM SETUP
If the supply tray configuration has been changed, adjust and check the image write
start position.
p.154 Image Data
Write Position
Adjustment
31
Secure the supply tray 3 cover into position
using 2 screws (TP screws M4X8).
30
Secure the supply tray 2 front cover using 2
screws the front (TP screws M3X6) and one
screw at each edge (TP screws M3X6).
Содержание DRYPRO793
Страница 4: ......
Страница 34: ...Ch 1 Pre installation Information 30 DRYPRO Vstage MODEL 793 Installation Manual Ver 1 00 2004 11...
Страница 88: ...Ch 2 Unpacking and Installation 84 DRYPRO Vstage MODEL 793 Installation Manual Ver 1 00 2004 11...
Страница 140: ...Ch 3 Setup 136 DRYPRO Vstage MODEL 793 Installation Manual Ver 1 00 2004 11...
Страница 198: ...Ch 6 Web Maintenance Mode 194 DRYPRO Vstage MODEL 793 Installation Manual Ver 1 00 2004 11...