Ch.2 Unpacking and Installation
< 45 >
DRYPRO Vstage MODEL 793 Installation Manual Ver.1.00 2004.11
2.4.6 Installing Supply Tray (Option)
After removal of the protection hardware securing the pickup unit, the optional supply tray 2&3 may
be installed.
1
Check to ensure that all supply tray (option)
components are included in the consignment.
2
Disengage the supply tray 1 lock by inserting a
driver with a shaft length of 90mm or more
shown below into the hole at the right side of the
main body and pressing down the latch.
- This will disengage the supply tray 1 lock.
4
Loosen the two screws (TP screws M4X8) and
remove the supply tray 1 cover.
3
Pull out supply tray 1 to its fullest extent.
5
Set supply tray 1 in place in the main body.
Содержание DRYPRO793
Страница 4: ......
Страница 34: ...Ch 1 Pre installation Information 30 DRYPRO Vstage MODEL 793 Installation Manual Ver 1 00 2004 11...
Страница 88: ...Ch 2 Unpacking and Installation 84 DRYPRO Vstage MODEL 793 Installation Manual Ver 1 00 2004 11...
Страница 140: ...Ch 3 Setup 136 DRYPRO Vstage MODEL 793 Installation Manual Ver 1 00 2004 11...
Страница 198: ...Ch 6 Web Maintenance Mode 194 DRYPRO Vstage MODEL 793 Installation Manual Ver 1 00 2004 11...