Ch.2 Unpacking and Installation
< 63 >
DRYPRO Vstage MODEL 793 Installation Manual Ver.1.00 2004.11
9
Tighten the 4 screws (Sems
2
M4X8) at the
front and back of the upper cover (heat-
processing unit).
10
Attach the cable at the far side of the heat-
processing unit the 2 clamps.
11
Holding the 3 heat-processing drum cables in
the left hand, return the heat exposure unit slide
plate into the main body.
Upper Cover
Front
Make sure that the 3 cables do no come into contact with internal components such
as rollers: such contact may cause damage.
12
Secure the heat-processing unit slide plate to
the main body using 3 screws (TP screws
M4X)8.
Содержание DRYPRO793
Страница 4: ......
Страница 34: ...Ch 1 Pre installation Information 30 DRYPRO Vstage MODEL 793 Installation Manual Ver 1 00 2004 11...
Страница 88: ...Ch 2 Unpacking and Installation 84 DRYPRO Vstage MODEL 793 Installation Manual Ver 1 00 2004 11...
Страница 140: ...Ch 3 Setup 136 DRYPRO Vstage MODEL 793 Installation Manual Ver 1 00 2004 11...
Страница 198: ...Ch 6 Web Maintenance Mode 194 DRYPRO Vstage MODEL 793 Installation Manual Ver 1 00 2004 11...