Ch.2 Unpacking and Installation
< 59 >
DRYPRO Vstage MODEL 793 Installation Manual Ver.1.00 2004.11
10
As shown at left, tilt the upper opposing rack 90˚
with its outer edge as fulcrum before removing.
(2)
(1)
Tilt the upper opposing
rack 90˚ with the
fulcrum here.
11
Check to ensure that bearings or springs are not
damaged or loose.
- Any loose springs should be reset in position.
- In the event that springs are damaged or cannot be
reset into position, the product should be
processed as an incomplete consignment.
12
Remove the protective mylar sheet from the
heat-processing drum.
Disengagement or change of the upper facing rack bearing or spring may lead to
artifacts in image. Therefore, due care should be taken.
Care must be taken not to damage the HPRO drum.
13
Remove the heat-processing drum holding the
cable at the rear of the drum in the left hand.
Содержание DRYPRO793
Страница 4: ......
Страница 34: ...Ch 1 Pre installation Information 30 DRYPRO Vstage MODEL 793 Installation Manual Ver 1 00 2004 11...
Страница 88: ...Ch 2 Unpacking and Installation 84 DRYPRO Vstage MODEL 793 Installation Manual Ver 1 00 2004 11...
Страница 140: ...Ch 3 Setup 136 DRYPRO Vstage MODEL 793 Installation Manual Ver 1 00 2004 11...
Страница 198: ...Ch 6 Web Maintenance Mode 194 DRYPRO Vstage MODEL 793 Installation Manual Ver 1 00 2004 11...