5 Installing the Cabinet
Issue 01 (2019-03-05)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
70
Figure 5-8
Securing a cabinet
----End
5.4 Installing Cabinet Accessories
5.4.1 (Optional) Taking Out PDU2000 Cables and Industrial
Connectors
Prerequisites
PDU2000s are equipped with industrial connectors.
Procedure
Step 1
Remove the rodent-proof mesh on the top of the PDU2000 in a cabinet, and take out the two
PDU2000 industrial connectors from the top, as shown in