FusionModule5000 Smart Modular Data Center
Installation Guide (Single-Row Aisle Containment with
2000 mm High Cabinets, ECC800)
4 Hardware Installation Preparations
Issue 01 (2019-03-05)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
45
Figure 4-28
Checking the air pressure
----End
Follow-up Procedure
Check that thermal insulation foam is in close contact with the pipes, there is no crack in each
cutting position, and the chilled water valve is tightly wrapped by thermal insulation foam.
4.2.3 Installing Water Pipe Adapters
Context
As illustrated in
and
, there are three methods to connect water inlet or
outlet pipes to reserved ports in the cabinet. Accordingly there are three methods to install
water pipe adapters. If the NetCol520 is deployed, use method A shown in
connect water inlet or outlet pipes. If no NetCol520 is deployed, determine the appropriate
connection method based on site requirements.
This section describes how to install a pagoda connector using method A.
Procedure
Step 1
Remove the side panels, as shown by