FusionModule5000 Smart Modular Data Center
Installation Guide (Single-Row Aisle Containment with
2000 mm High Cabinets, ECC800)
4 Hardware Installation Preparations
Issue 01 (2019-03-05)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
26
Figure 4-7
Positioning combined bases
Step 7
Check that L1, L2, L3, and L4 meet the following requirements: |L1–L2| ≤ 5 mm and |L3–L4|
≤ 5 mm, as shown in
Figure 4-8
Base layout (unit: mm)
Step 8
Use a marker to mark the hole positions, as shown by (2) in
----End
4.1.1.3.3 Securing Bases
Prerequisites
The positions for installing bases have been determined.