FusionModule5000 Smart Modular Data Center
Installation Guide (Single-Row Aisle Containment with
2000 mm High Cabinets, ECC800)
A Appendix
Issue 01 (2019-03-05)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
202
Figure A-4
Preparing a Cord End Terminal
(A) Cord end terminal connector
(B) Insulation layer
(C) Copper core wire
Preparing an RS485 Monitoring Cable
shows how to prepare a monitoring cable for the ECC collector.