FusionModule5000 Smart Modular Data Center
Installation Guide (Single-Row Aisle Containment with
2000 mm High Cabinets, ECC800)
4 Hardware Installation Preparations
Issue 01 (2019-03-05)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
60
Align the upper and lower holes before tightening screws.
The tail frame side with anchor bolts should face the cabinet bottom.
Figure 4-45
Securing the tail frame
Step 7
Install the hinges and connecting plates removed in
on the corresponding positions on
the tail frame.
Step 8
Install the PDC rear door on the tail frame.
After installing the PDC rear door, ensure that ground cables are properly connected to the
cabinet and PDC rear door.
----End
4.8 Routing Air Conditioner Pipes
Preinstall the air conditioner pipes by referring to the onsite engineering layout diagram and
NetCol5000-C 30 kW Chilled Water In-Row Precision Air Conditioner Quick Guide