4 Hardware Installation Preparations
Issue 01 (2019-03-05)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
35
Figure 4-20
Drilling a hole (unit: mm)
Step 5
Measure the hole depths and distances. If any deviation is found, drill new holes.
Step 6
Installing an expansion bolt, as shown in
1.
Vertically insert an expansion bolt into a hole, and drive the expansion bolt completely
into the hole using a rubber mallet.
2.
Rotate the expansion bolt clockwise using a wrench until the expansion sleeve fully
expands.
3.
Rotate the expansion bolt counterclockwise to remove it together with the spring washer
and flat washer.
Figure 4-21
Installing an expansion bolt
Step 7
Move the base back to the position so that expansion bolts are inserted into mounting holes on
supports. Secure the base to the concrete floor using expansion bolts obtained in
, as
shown in