FusionModule5000 Smart Modular Data Center
Installation Guide (Single-Row Aisle Containment with
2000 mm High Cabinets, ECC800)
1 Installation Preparations
Issue 01 (2019-03-05)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
12
Name, Specifications, and Appearance
NOTE
This table may not list some tools required at specific sites. Onsite installation personnel and technical
support personnel should prepare tools based on site requirements.
Table 1-5
Transportation and unpacking tools
Tool Appearance, Specifications, and Name
Pallet truck
Diesel forklift
Lifting rope (bearing
capacity ≥ 400 kg)
Lever (bearing
capacity ≥ 400 kg)
Table 1-6
Air conditioner tools
Tool Appearance, Specifications, and Name
36 mm adjustable
wrench (2 PCS)
Socket wrench
M10/M12
5 mm hex key
Open end torque
wrench
Steel brush
Hot melt device
(used when the
water pipes are
made of PPR or
aluminum-plastic
material)
Nitrogen cylinder
Pressure gauge