Figure 8-6
Installing a supporting plate
Step 5
Install a partition plate. Press both sides of the V-shaped partition plate with hands to decrease
the angle to a proper degree, and clamp the clasps at the bottom into the nearby holes, as
shown in
. (By default, clamp the clasps into the two holes in the middle. In actual
conditions, you can select holes as required.)
Figure 8-7
Installing a partition plate
Step 6
Install adjacent cable troughs in the same way.
Step 7
Rotate the interconnecting wrench and clamp it into the clasps until the wrench is horizontal,
as shown in