FusionModule5000 Smart Modular Data Center
Installation Guide (Single-Row Aisle Containment with
2000 mm High Cabinets, ECC800)
9 Installing Monitoring Devices
Issue 01 (2019-03-05)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
151
Figure 9-56
Securing a baffle plate
----End
9.9 (Optional) Installing a Smart ETH Gateway
Prerequisites
You have prepared a smart ETH gateway and installation accessories such as the guide
rail (delivered with the smart ETH gateway) and screws.
The number of smart ETH gateways to be installed and their installation positions have
been specified.
Context
Components marked in the same background color should be connected to the same smart ETH
gateway.
Table 9-4
Scenario 1
Scenario
Rules for Deploying Smart ETH
Gateways
No rack environment unit deployed
Module length ≤ 7 m; number of air
conditioners ≤ 4
Deploy 2 PCS for each end cabinet in the
smart module, not for other cabinets. A total
of 4 PCS should be deployed, as shown in