Figure 12-22
Base grounding diagram
(1) Base ground points
Connect one end of the base ground cable to any of the base ground points shown by (1)
in
, and connect the other end to the general ground copper bar of the
equipment room.
Connect one end of the base ground cable to any of the base ground points shown by (1)
in
, and connect the other end to the ground copper bar at the rear door
bottom inside the cabinet, as shown in
. Then connect the module ground
cables by following instructions in
Figure 12-23
Connecting the ground cable between the base and cabinet